Suppliers and service providers

Zona artigianale ovest 3 - Casateia
I-39040 Racines (BZ)
T (+39) 0472 779515
F (+39) 0472 779649
en-co@energy-control.it
www.energy-control.it

Performance: EN-CO was responsible for the electrical power transmission. This includes the laying of the MV-cables, as well as the delivery and installation of the distribution stations.
The 2,2km long power line connects the industrial park “Eisackstraße” and the power substation “Wiesen/Pfitsch”. This new power line allows also a few producers the handing in of their produced electrical energy.
The delivered distribution station are built of prefabricated concrete parts and contain the entire MV-switchboards, which correspond to the prescribed guidelines of the local electric supply authorities.

News: Participation at Biogas Science
From 17th to 19th September, the international conference "Biogas Science"...
News: Annual inspection: LIFE Optimal continues
On the 30th and 31st of July 2018 the annual control of the project activities...
News: LIFE DOP – The digestate in organic farming– 17 novembre 2017 - Mantova
On November 17th 2017 the convention “Il digestato nell’agricoltura biologica –...